RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0805007541 - Archived data from Tue, 11. August 2020 17:57:10 CEST


This is all the information about APD 0805007541. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0805007541
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387.9 V
Dark current: 3.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 300
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 83
Position in grid: 7
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 387.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.6126425 V     T = -25 °C: 352.2452966 V
Voltage for Gain 150: T = +20 °C: 395.5036815 V     T = -25 °C: 359.9536916 V
Voltage for Gain 200: T = +20 °C: 399.8672053 V     T = -25 °C: 364.2605502 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.368864693 V-1     T = -25 °C: 5.291000304 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.518874096 V-1     T = -25 °C: 9.891196386 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.79522584 V-1     T = -25 °C: 14.29820131 V-1
Break-through voltage: T = +20 °C: 415.0192435 V     T = -25 °C: 378.7158678 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:01 CET jreher Updated box and position via API.
11. Aug 2020 17:57:10 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:55 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:46 CEST jreher Updated box and position via API.
19. Dec 2019 15:53:09 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:51 CET jreher Updated box and position via API.
23. Aug 2017 16:06:39 CEST markus.moritz Entered shipped after irradiation date.
09. Aug 2017 14:30:05 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:56:44 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:51:30 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:18 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:31 CEST Tobias Imported from Hamamatsu datasheet.