RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3003033371 - Archived data from Fri, 05. February 2021 11:02:58 CET


This is all the information about APD 3003033371. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3003033371
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F12
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.8 V
Dark current: 18.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 18
EP1 batch: 118
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.7936016 V     T = -25 °C: 347.3833579 V
Voltage for Gain 150: T = +20 °C: 391.4642152 V     T = -25 °C: 354.9068612 V
Voltage for Gain 200: T = +20 °C: 395.7236542 V     T = -25 °C: 359.1359611 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.810748872 V-1     T = -25 °C: 4.709564941 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.798335489 V-1     T = -25 °C: 9.438249877 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.42865584 V-1     T = -25 °C: 14.74318227 V-1
Break-through voltage: T = +20 °C: 410.1285702 V     T = -25 °C: 374.1911322 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:26:22 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:58 CET jreher Updated box and position via API.
11. Aug 2020 18:06:31 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:19 CEST jreher Updated APD location via API.
25. Feb 2020 17:04:15 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:58 CET jreher Updated APD location via API.
27. Nov 2019 19:48:37 CET jreher Updated APD location via API.
25. Nov 2019 17:19:52 CET jreher Updated box and position via API.
27. Aug 2019 12:11:18 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:26 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:19 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:46 CEST Tobias Imported from Hamamatsu datasheet.