RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3003033363 - Archived data from Thu, 15. April 2021 17:01:05 CEST


This is all the information about APD 3003033363. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3003033363
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.7 V
Dark current: 18.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 21
EP1 batch: 118
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.8725926 V     T = -25 °C: 344.277903 V
Voltage for Gain 150: T = +20 °C: 387.6344465 V     T = -25 °C: 351.6692715 V
Voltage for Gain 200: T = +20 °C: 391.9529696 V     T = -25 °C: 355.8184349 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.646171885 V-1     T = -25 °C: 4.822869015 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.264109084 V-1     T = -25 °C: 9.750634032 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.50080077 V-1     T = -25 °C: 15.32895469 V-1
Break-through voltage: T = +20 °C: 407.5029229 V     T = -25 °C: 371.2611022 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:46:09 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:05 CEST jreher Updated box and position via API.
05. Feb 2021 11:02:57 CET jreher Updated box and position via API.
11. Aug 2020 18:06:29 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:18 CEST jreher Updated APD location via API.
25. Feb 2020 17:04:14 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:58 CET jreher Updated APD location via API.
27. Nov 2019 19:48:37 CET jreher Updated APD location via API.
25. Nov 2019 17:19:52 CET jreher Updated box and position via API.
27. Aug 2019 12:11:17 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:25 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:19 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:46 CEST Tobias Imported from Hamamatsu datasheet.