RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3003033350 - Archived data from Fri, 05. February 2021 11:02:56 CET


This is all the information about APD 3003033350. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3003033350
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 19.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 8
EP1 batch: 118
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1787998 V     T = -25 °C: 346.1257802 V
Voltage for Gain 150: T = +20 °C: 388.9835793 V     T = -25 °C: 353.5530127 V
Voltage for Gain 200: T = +20 °C: 393.3667288 V     T = -25 °C: 357.7632257 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.407866078 V-1     T = -25 °C: 5.183151379 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.902776908 V-1     T = -25 °C: 9.731059533 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.81932852 V-1     T = -25 °C: 14.74924436 V-1
Break-through voltage: T = +20 °C: 409.0234652 V     T = -25 °C: 373.0871587 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:26:21 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:56 CET jreher Updated box and position via API.
11. Aug 2020 18:06:27 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:17 CEST jreher Updated APD location via API.
25. Feb 2020 17:04:14 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:57 CET jreher Updated APD location via API.
27. Nov 2019 19:48:36 CET jreher Updated APD location via API.
25. Nov 2019 17:19:51 CET jreher Updated box and position via API.
27. Aug 2019 12:11:16 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:24 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:19 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:46 CEST Tobias Imported from Hamamatsu datasheet.