RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3003033341 - Archived data from Tue, 11. August 2020 18:06:25 CEST


This is all the information about APD 3003033341. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3003033341
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 20.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 113
Position in Box: 2
EP1 batch: 118
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.8454829 V     T = -25 °C: 347.3308331 V
Voltage for Gain 150: T = +20 °C: 390.7338594 V     T = -25 °C: 354.7618787 V
Voltage for Gain 200: T = +20 °C: 395.1282153 V     T = -25 °C: 358.9307621 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.647772024 V-1     T = -25 °C: 4.774859011 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.149246288 V-1     T = -25 °C: 9.644390374 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.20191746 V-1     T = -25 °C: 15.26221974 V-1
Break-through voltage: T = +20 °C: 411.7551909 V     T = -25 °C: 374.035483 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:35:59 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:01:32 CEST jreher Updated box and position via API.
05. Feb 2021 11:02:55 CET jreher Updated box and position via API.
11. Aug 2020 18:06:25 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:16 CEST jreher Updated APD location via API.
25. Feb 2020 17:04:13 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:56 CET jreher Updated APD location via API.
27. Nov 2019 19:48:35 CET jreher Updated APD location via API.
25. Nov 2019 17:19:50 CET jreher Updated box and position via API.
27. Aug 2019 12:11:16 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:24 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:19 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:46 CEST Tobias Imported from Hamamatsu datasheet.