RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0805007537 - Archived data from Fri, 05. February 2021 11:27:00 CET


This is all the information about APD 0805007537. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0805007537
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.6 V
Dark current: 2.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 300
Position in Box: 21
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 83
Position in grid: 1
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 383.6 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.4922394 V     T = -25 °C: 347.8057764 V
Voltage for Gain 150: T = +20 °C: 391.3751082 V     T = -25 °C: 355.2856274 V
Voltage for Gain 200: T = +20 °C: 395.7380221 V     T = -25 °C: 359.4903085 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.394362403 V-1     T = -25 °C: 4.916916385 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.537181241 V-1     T = -25 °C: 8.984479043 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.73632096 V-1     T = -25 °C: 15.73335186 V-1
Break-through voltage: T = +20 °C: 411.5271904 V     T = -25 °C: 375.3060826 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:35:50 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:16:41 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:27:00 CET jreher Updated box and position via API.
11. Aug 2020 17:57:10 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:55 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:45 CEST jreher Updated box and position via API.
19. Dec 2019 15:52:02 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:50 CET jreher Updated box and position via API.
23. Aug 2017 16:06:39 CEST markus.moritz Entered shipped after irradiation date.
09. Aug 2017 14:30:05 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:56:44 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:51:30 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:18 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:31 CEST Tobias Imported from Hamamatsu datasheet.