RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3003033336 - Archived data from Wed, 07. October 2020 14:22:39 CEST


This is all the information about APD 3003033336. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3003033336
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1911021084/3003033336
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.1 V
Dark current: 19.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 112
Position in Box: 47
EP1 batch: 117
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9380741 V     T = -25 °C: 345.6049383 V
Voltage for Gain 150: T = +20 °C: 388.7141056 V     T = -25 °C: 352.9370975 V
Voltage for Gain 200: T = +20 °C: 393.0201494 V     T = -25 °C: 357.0391964 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.726716383 V-1     T = -25 °C: 4.752409647 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.481497347 V-1     T = -25 °C: 9.732838516 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.90697267 V-1     T = -25 °C: 15.63303854 V-1
Break-through voltage: T = +20 °C: 407.8476893 V     T = -25 °C: 371.5973918 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:52 CET jreher Updated box and position via API.
07. Oct 2020 14:22:39 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:53 CEST jreher Updated box and position via API.
11. Aug 2020 17:46:49 CEST jreher Updated APD characteristics via API.
03. Dec 2019 15:03:13 CET jreher Updated APD location via API.
29. Nov 2019 11:46:56 CET jreher Updated APD location via API.
27. Nov 2019 19:48:28 CET jreher Updated APD location via API.
25. Nov 2019 17:19:49 CET jreher Updated box and position via API.
25. Nov 2019 14:20:15 CET spankonin Updated APD batch assignment via API.
18. Nov 2019 18:17:52 CET spankonin Updated APD batch assignment via API.
27. Aug 2019 12:11:48 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:19 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:18 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:46 CEST Tobias Imported from Hamamatsu datasheet.