RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3003033335 - Archived data from Fri, 05. February 2021 11:02:52 CET


This is all the information about APD 3003033335. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3003033335
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 18.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 112
Position in Box: 46
EP1 batch: 117
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6109507 V     T = -25 °C: 347.3635834 V
Voltage for Gain 150: T = +20 °C: 390.4186504 V     T = -25 °C: 354.7424621 V
Voltage for Gain 200: T = +20 °C: 394.7602117 V     T = -25 °C: 358.8741765 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.437369453 V-1     T = -25 °C: 4.795082539 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.669212793 V-1     T = -25 °C: 9.789951598 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.04283591 V-1     T = -25 °C: 15.51165811 V-1
Break-through voltage: T = +20 °C: 408.5613453 V     T = -25 °C: 373.6771598 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 12:54:36 CET oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:46 CEST jreher Updated box and position via API.
05. Feb 2021 11:02:52 CET jreher Updated box and position via API.
11. Aug 2020 17:46:49 CEST jreher Updated APD characteristics via API.
03. Dec 2019 15:03:13 CET jreher Updated APD location via API.
29. Nov 2019 11:46:56 CET jreher Updated APD location via API.
27. Nov 2019 19:48:28 CET jreher Updated APD location via API.
25. Nov 2019 17:19:49 CET jreher Updated box and position via API.
25. Nov 2019 14:20:15 CET spankonin Updated APD batch assignment via API.
18. Nov 2019 18:17:52 CET spankonin Updated APD batch assignment via API.
27. Aug 2019 12:11:48 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:19 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:18 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:46 CEST Tobias Imported from Hamamatsu datasheet.