RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3002033324 - Archived data from Thu, 15. April 2021 16:43:11 CEST


This is all the information about APD 3002033324. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3002033324
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 3002033324/0803007439
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.4 V
Dark current: 21.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 112
Position in Box: 36
EP1 batch: 117
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.7078418 V     T = -25 °C: 351.8340428 V
Voltage for Gain 150: T = +20 °C: 395.5831683 V     T = -25 °C: 359.3185433 V
Voltage for Gain 200: T = +20 °C: 399.9477774 V     T = -25 °C: 363.5153767 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.668641408 V-1     T = -25 °C: 4.906198228 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.321871563 V-1     T = -25 °C: 9.061899778 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.60377218 V-1     T = -25 °C: 16.08435238 V-1
Break-through voltage: T = +20 °C: 415.6946555 V     T = -25 °C: 379.1655374 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:07 CEST jreher Updated box and position via API.
15. Apr 2021 16:43:11 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:02:51 CET jreher Updated box and position via API.
11. Aug 2020 17:46:48 CEST jreher Updated APD characteristics via API.
03. Dec 2019 15:03:12 CET jreher Updated APD location via API.
29. Nov 2019 11:46:55 CET jreher Updated APD location via API.
27. Nov 2019 19:48:27 CET jreher Updated APD location via API.
25. Nov 2019 17:19:48 CET jreher Updated box and position via API.
14. Nov 2019 17:31:23 CET spankonin Updated APD batch assignment via API.
27. Aug 2019 12:11:47 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:18 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:18 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:46 CEST Tobias Imported from Hamamatsu datasheet.