Show Hamamatsu Avalanche Photo Diode 0805007535 - Archived data from Tue, 11. August 2020 17:57:10 CEST
This is all the information about APD 0805007535. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 0805007535 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | G08 |
Break-through voltage: | 417 V |
Voltage for Gain 100 (T=+25°C): | 389.9 V |
Dark current: | 3.6 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 300 |
Position in Box: | 20 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | 83 |
Position in grid: | 16 |
Arrival for irradiation: | 03. Aug 2017 |
Sent for analysis after irradiation: | 17. Aug 2017 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Aug 2017 |
Dose used: | 45 Gy |
Temperature: | 20 °C |
Position: | 2 |
Bias voltage: | 389.9 V (connected) |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 389.4686372 V T = -25 °C: 353.4254104 V |
Voltage for Gain 150: | T = +20 °C: 397.3550158 V T = -25 °C: 361.0319066 V |
Voltage for Gain 200: | T = +20 °C: 401.7232735 V T = -25 °C: 365.3017385 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.429175321 V-1 T = -25 °C: 4.62411 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.65714294 V-1 T = -25 °C: 9.210710598 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.0700076 V-1 T = -25 °C: 14.33679683 V-1 |
Break-through voltage: | T = +20 °C: 416.627546 V T = -25 °C: 380.7403126 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:27:00 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:57:10 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:42:55 CEST | jreher | Updated APD location via API. |
21. Jul 2020 14:42:45 CEST | jreher | Updated box and position via API. |
19. Dec 2019 15:52:02 CET | spankonin | Updated APD batch assignment via API. |
19. Dec 2019 15:17:50 CET | jreher | Updated box and position via API. |
23. Aug 2017 16:06:39 CEST | markus.moritz | Entered shipped after irradiation date. |
09. Aug 2017 14:30:05 CEST | hans-georg.zaunick | Entered irradiation information. |
07. Aug 2017 16:56:44 CEST | hans-georg.zaunick | Entered arrival for irradiation date. |
07. Aug 2017 16:51:30 CEST | hans-georg.zaunick | Entered arrival for irradiation date. |
04. Aug 2017 03:15:18 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
22. Jun 2016 15:24:31 CEST | Tobias | Imported from Hamamatsu datasheet. |