RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3002033316 - Archived data from Tue, 11. August 2020 17:46:46 CEST


This is all the information about APD 3002033316. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3002033316
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.6 V
Dark current: 18 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 112
Position in Box: 29
EP1 batch: 117
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.9181477 V     T = -25 °C: 351.9530622 V
Voltage for Gain 150: T = +20 °C: 395.7726652 V     T = -25 °C: 359.4198206 V
Voltage for Gain 200: T = +20 °C: 400.128821 V     T = -25 °C: 363.5891915 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.612622947 V-1     T = -25 °C: 4.868217949 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.158115686 V-1     T = -25 °C: 8.959728579 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.25318144 V-1     T = -25 °C: 15.89703084 V-1
Break-through voltage: T = +20 °C: 415.5904593 V     T = -25 °C: 378.8833194 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:51 CET jreher Updated box and position via API.
11. Aug 2020 17:46:46 CEST jreher Updated APD characteristics via API.
03. Dec 2019 15:03:11 CET jreher Updated APD location via API.
29. Nov 2019 11:46:55 CET jreher Updated APD location via API.
27. Nov 2019 19:48:26 CET jreher Updated APD location via API.
25. Nov 2019 17:19:48 CET jreher Updated box and position via API.
14. Nov 2019 17:31:22 CET spankonin Updated APD batch assignment via API.
27. Aug 2019 12:11:47 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:18 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:18 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:45 CEST Tobias Imported from Hamamatsu datasheet.