RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3002033269 - Archived data from Tue, 11. August 2020 17:46:38 CEST


This is all the information about APD 3002033269. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3002033269
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.7 V
Dark current: 25.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 111
Position in Box: 38
EP1 batch: 115
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.1833612 V     T = -25 °C: 351.4783949 V
Voltage for Gain 150: T = +20 °C: 394.9727284 V     T = -25 °C: 358.9128123 V
Voltage for Gain 200: T = +20 °C: 399.2885773 V     T = -25 °C: 363.070914 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.608567868 V-1     T = -25 °C: 4.72050715 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.175327578 V-1     T = -25 °C: 9.635472156 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.41996888 V-1     T = -25 °C: 15.35787511 V-1
Break-through voltage: T = +20 °C: 414.1512662 V     T = -25 °C: 377.8527808 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:43 CET jreher Updated box and position via API.
11. Aug 2020 17:46:38 CEST jreher Updated APD characteristics via API.
03. Dec 2019 15:02:42 CET jreher Updated APD location via API.
29. Nov 2019 11:46:51 CET jreher Updated APD location via API.
27. Nov 2019 19:48:16 CET jreher Updated APD location via API.
25. Nov 2019 17:19:44 CET jreher Updated box and position via API.
14. Nov 2019 17:31:06 CET spankonin Updated APD batch assignment via API.
23. Aug 2019 12:02:41 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:11 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:17 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:45 CEST Tobias Imported from Hamamatsu datasheet.