RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2911033212 - Archived data from Wed, 16. June 2021 16:03:28 CEST


This is all the information about APD 2911033212. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2911033212
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A09
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.9 V
Dark current: 11.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 111
Position in Box: 9
EP1 batch: 115
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.3074641 V     T = -25 °C: 350.4996135 V
Voltage for Gain 150: T = +20 °C: 394.1159304 V     T = -25 °C: 357.9185966 V
Voltage for Gain 200: T = +20 °C: 398.4640573 V     T = -25 °C: 362.0722561 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.511565712 V-1     T = -25 °C: 4.692285014 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.905835166 V-1     T = -25 °C: 9.512284109 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.69457472 V-1     T = -25 °C: 15.0489311 V-1
Break-through voltage: T = +20 °C: 413.5769613 V     T = -25 °C: 377.3586954 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:34:54 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:28 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:59:46 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:26 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:40 CET jreher Updated box and position via API.
11. Aug 2020 17:46:33 CEST jreher Updated APD characteristics via API.
03. Dec 2019 15:02:40 CET jreher Updated APD location via API.
29. Nov 2019 11:46:49 CET jreher Updated APD location via API.
27. Nov 2019 19:48:14 CET jreher Updated APD location via API.
25. Nov 2019 17:19:41 CET jreher Updated box and position via API.
14. Nov 2019 17:30:43 CET spankonin Updated APD batch assignment via API.
23. Aug 2019 12:02:39 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:08 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:16 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:44 CEST Tobias Imported from Hamamatsu datasheet.