RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2910033182 - Archived data from Mon, 17. May 2021 09:16:20 CEST


This is all the information about APD 2910033182. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2910033182
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 378.2 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 111
Position in Box: 1
EP1 batch: 114
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.1202986 V     T = -25 °C: 342.8474299 V
Voltage for Gain 150: T = +20 °C: 385.9143985 V     T = -25 °C: 350.1580622 V
Voltage for Gain 200: T = +20 °C: 390.2610132 V     T = -25 °C: 354.2752128 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.601755435 V-1     T = -25 °C: 5.023124612 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.065477465 V-1     T = -25 °C: 9.42872356 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1994107 V-1     T = -25 °C: 14.85254989 V-1
Break-through voltage: T = +20 °C: 405.7762574 V     T = -25 °C: 369.6112245 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:26:42 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:16:20 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:39 CET jreher Updated box and position via API.
11. Aug 2020 17:46:32 CEST jreher Updated APD characteristics via API.
03. Dec 2019 15:02:39 CET jreher Updated APD location via API.
29. Nov 2019 11:46:49 CET jreher Updated APD location via API.
27. Nov 2019 19:48:13 CET jreher Updated APD location via API.
25. Nov 2019 17:19:41 CET jreher Updated box and position via API.
14. Nov 2019 17:30:43 CET spankonin Updated APD batch assignment via API.
23. Aug 2019 12:02:21 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:51:08 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:16 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:44 CEST Tobias Imported from Hamamatsu datasheet.