RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2910033155 - Archived data from Tue, 11. August 2020 18:00:31 CEST


This is all the information about APD 2910033155. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2910033155
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 388.8 V
Dark current: 13.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 110
Position in Box: 38
EP1 batch: 114
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.4170844 V     T = -25 °C: 353.5077146 V
Voltage for Gain 150: T = +20 °C: 397.2627512 V     T = -25 °C: 361.0407248 V
Voltage for Gain 200: T = +20 °C: 401.6147332 V     T = -25 °C: 365.2600848 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.461200943 V-1     T = -25 °C: 4.661577972 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.76075565 V-1     T = -25 °C: 9.255694913 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.33160816 V-1     T = -25 °C: 14.53401013 V-1
Break-through voltage: T = +20 °C: 416.2602634 V     T = -25 °C: 379.958556 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:35 CET jreher Updated box and position via API.
11. Aug 2020 18:00:31 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:15 CEST jreher Updated APD location via API.
28. Jan 2020 16:03:06 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:48 CET jreher Updated APD location via API.
28. Nov 2019 12:12:54 CET jreher Updated box and position via API.
27. Nov 2019 19:48:05 CET jreher Updated APD location via API.
23. Aug 2019 12:02:20 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:14:15 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:43 CEST Tobias Imported from Hamamatsu datasheet.