RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2910033149 - Archived data from Thu, 15. April 2021 16:43:12 CEST


This is all the information about APD 2910033149. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2910033149
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2910033149/3211035224
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 387.6 V
Dark current: 12 nA
   
Screening Logistics:  
Available: No
Storage Box: 110
Position in Box: 35
EP1 batch: 114
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.9270301 V     T = -25 °C: 351.7614532 V
Voltage for Gain 150: T = +20 °C: 395.6980896 V     T = -25 °C: 359.2473955 V
Voltage for Gain 200: T = +20 °C: 399.9946127 V     T = -25 °C: 363.4510188 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.663641993 V-1     T = -25 °C: 4.913184903 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.396879283 V-1     T = -25 °C: 9.122273608 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.72056866 V-1     T = -25 °C: 16.18399613 V-1
Break-through voltage: T = +20 °C: 415.2567509 V     T = -25 °C: 378.8049696 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:09 CEST jreher Updated box and position via API.
15. Apr 2021 16:43:12 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:02:35 CET jreher Updated box and position via API.
11. Aug 2020 18:00:29 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:15 CEST jreher Updated APD location via API.
28. Jan 2020 16:03:06 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:47 CET jreher Updated APD location via API.
28. Nov 2019 12:12:54 CET jreher Updated box and position via API.
27. Nov 2019 19:48:05 CET jreher Updated APD location via API.
23. Aug 2019 12:02:20 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:14:15 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:43 CEST Tobias Imported from Hamamatsu datasheet.