RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2910033147 - Archived data from Mon, 10. May 2021 14:00:14 CEST


This is all the information about APD 2910033147. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2910033147
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 110
Position in Box: 33
EP1 batch: 114
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.4324565 V     T = -25 °C: 344.1683993 V
Voltage for Gain 150: T = +20 °C: 387.2073454 V     T = -25 °C: 351.4841181 V
Voltage for Gain 200: T = +20 °C: 391.5570295 V     T = -25 °C: 355.5653834 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.501783445 V-1     T = -25 °C: 4.902963278 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.818230612 V-1     T = -25 °C: 9.087976347 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.37035108 V-1     T = -25 °C: 16.28888678 V-1
Break-through voltage: T = +20 °C: 407.038532 V     T = -25 °C: 370.7005242 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 09:59:33 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:14 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:35 CET jreher Updated box and position via API.
11. Aug 2020 18:00:29 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:14 CEST jreher Updated APD location via API.
28. Jan 2020 16:03:06 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:47 CET jreher Updated APD location via API.
28. Nov 2019 12:12:53 CET jreher Updated box and position via API.
27. Nov 2019 19:48:05 CET jreher Updated APD location via API.
23. Aug 2019 12:02:20 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:14:15 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:43 CEST Tobias Imported from Hamamatsu datasheet.