RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2910033135 - Archived data from Fri, 05. February 2021 11:02:33 CET


This is all the information about APD 2910033135. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2910033135
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 384.4 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 110
Position in Box: 22
EP1 batch: 113
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.8280715 V     T = -25 °C: 349.0390185 V
Voltage for Gain 150: T = +20 °C: 392.7360278 V     T = -25 °C: 356.5686474 V
Voltage for Gain 200: T = +20 °C: 397.1227812 V     T = -25 °C: 360.790095 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.665321641 V-1     T = -25 °C: 4.862397473 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.222019767 V-1     T = -25 °C: 8.853279593 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35850753 V-1     T = -25 °C: 15.52721675 V-1
Break-through voltage: T = +20 °C: 410.1755819 V     T = -25 °C: 376.0084912 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:24:01 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:01:51 CEST jreher Updated box and position via API.
05. Feb 2021 11:02:33 CET jreher Updated box and position via API.
11. Aug 2020 18:00:27 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:13 CEST jreher Updated APD location via API.
28. Jan 2020 16:03:05 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:46 CET jreher Updated APD location via API.
28. Nov 2019 12:12:53 CET jreher Updated box and position via API.
27. Nov 2019 19:48:04 CET jreher Updated APD location via API.
23. Aug 2019 12:01:51 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:14:14 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:43 CEST Tobias Imported from Hamamatsu datasheet.