RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2910033126 - Archived data from Mon, 03. May 2021 15:18:35 CEST


This is all the information about APD 2910033126. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2910033126
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 110
Position in Box: 17
EP1 batch: 113
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7748469 V     T = -25 °C: 345.4834611 V
Voltage for Gain 150: T = +20 °C: 388.6604247 V     T = -25 °C: 352.8754497 V
Voltage for Gain 200: T = +20 °C: 393.0464538 V     T = -25 °C: 357.019308 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.692087178 V-1     T = -25 °C: 4.75461244 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.252160081 V-1     T = -25 °C: 9.636379308 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.41531522 V-1     T = -25 °C: 15.21672736 V-1
Break-through voltage: T = +20 °C: 409.0411644 V     T = -25 °C: 372.7075729 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:16:29 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:18:35 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:33 CET jreher Updated box and position via API.
11. Aug 2020 18:00:26 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:13 CEST jreher Updated APD location via API.
28. Jan 2020 16:03:05 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:46 CET jreher Updated APD location via API.
28. Nov 2019 12:12:52 CET jreher Updated box and position via API.
27. Nov 2019 19:48:03 CET jreher Updated APD location via API.
23. Aug 2019 12:01:50 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:14:14 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:43 CEST Tobias Imported from Hamamatsu datasheet.