RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2910033123 - Archived data from Tue, 11. August 2020 18:00:26 CEST


This is all the information about APD 2910033123. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2910033123
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.3 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 110
Position in Box: 16
EP1 batch: 113
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.6408612 V     T = -25 °C: 343.4621824 V
Voltage for Gain 150: T = +20 °C: 386.4401359 V     T = -25 °C: 350.7603186 V
Voltage for Gain 200: T = +20 °C: 390.7824269 V     T = -25 °C: 354.8443177 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.426220436 V-1     T = -25 °C: 4.820864577 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.657225677 V-1     T = -25 °C: 9.867376451 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.12232779 V-1     T = -25 °C: 15.90390222 V-1
Break-through voltage: T = +20 °C: 406.5288617 V     T = -25 °C: 370.1371394 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:39:10 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:09 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:59:35 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:12 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:33 CET jreher Updated box and position via API.
11. Aug 2020 18:00:26 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:13 CEST jreher Updated APD location via API.
28. Jan 2020 16:03:04 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:46 CET jreher Updated APD location via API.
28. Nov 2019 12:12:52 CET jreher Updated box and position via API.
27. Nov 2019 19:48:03 CET jreher Updated APD location via API.
23. Aug 2019 12:01:50 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:14:14 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:43 CEST Tobias Imported from Hamamatsu datasheet.