RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2904032723 - Archived data from Tue, 11. August 2020 18:00:24 CEST


This is all the information about APD 2904032723. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2904032723
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 383.3 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 110
Position in Box: 7
EP1 batch: 113
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.2308903 V     T = -25 °C: 347.5909956 V
Voltage for Gain 150: T = +20 °C: 391.1089508 V     T = -25 °C: 355.0522274 V
Voltage for Gain 200: T = +20 °C: 395.4952933 V     T = -25 °C: 359.2527955 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.513882726 V-1     T = -25 °C: 4.660110407 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.87801164 V-1     T = -25 °C: 9.330389925 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.45614588 V-1     T = -25 °C: 14.61583061 V-1
Break-through voltage: T = +20 °C: 411.4453875 V     T = -25 °C: 375.1936109 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:31 CET jreher Updated box and position via API.
11. Aug 2020 18:00:24 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:12 CEST jreher Updated APD location via API.
28. Jan 2020 16:01:09 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:45 CET jreher Updated APD location via API.
28. Nov 2019 12:12:52 CET jreher Updated box and position via API.
28. Nov 2019 12:01:21 CET jreher Updated APD location via API.
23. Aug 2019 12:01:50 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:14 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:43 CEST Tobias Imported from Hamamatsu datasheet.