RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2904032716 - Archived data from Fri, 27. August 2021 10:30:46 CEST


This is all the information about APD 2904032716. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2904032716
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 110
Position in Box: 1
EP1 batch: 113
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.44956 V     T = -25 °C: 344.8219985 V
Voltage for Gain 150: T = +20 °C: 388.304395 V     T = -25 °C: 352.1954698 V
Voltage for Gain 200: T = +20 °C: 392.6704371 V     T = -25 °C: 356.3491107 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.455360236 V-1     T = -25 °C: 4.964958064 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.648619071 V-1     T = -25 °C: 9.237300983 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.96838762 V-1     T = -25 °C: 16.51404673 V-1
Break-through voltage: T = +20 °C: 408.7703921 V     T = -25 °C: 372.0560096 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:15:46 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:30:46 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:31 CET jreher Updated box and position via API.
11. Aug 2020 18:00:23 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:11 CEST jreher Updated APD location via API.
28. Jan 2020 16:01:09 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:45 CET jreher Updated APD location via API.
28. Nov 2019 12:12:51 CET jreher Updated box and position via API.
28. Nov 2019 12:01:20 CET jreher Updated APD location via API.
23. Aug 2019 12:01:49 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:14 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:43 CEST Tobias Imported from Hamamatsu datasheet.