Show Hamamatsu Avalanche Photo Diode 2904032716 - Archived data from Tue, 11. August 2020 17:49:11 CEST
This is all the information about APD 2904032716. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2904032716 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | D06 |
Break-through voltage: | 410 V |
Voltage for Gain 100 (T=+25°C): | 380.6 V |
Dark current: | 7 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 110 |
Position in Box: | 1 |
EP1 batch: | 113 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
10. Jun 2022 12:15:46 CEST | oafedulidis | Assigned to capsule by script |
27. Aug 2021 10:30:46 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 11:02:31 CET | jreher | Updated box and position via API. |
11. Aug 2020 18:00:23 CEST | jreher | Updated APD characteristics via API. |
11. Aug 2020 17:49:11 CEST | jreher | Updated APD location via API. |
28. Jan 2020 16:01:09 CET | spankonin | Updated APD batch assignment via API. |
29. Nov 2019 11:46:45 CET | jreher | Updated APD location via API. |
28. Nov 2019 12:12:51 CET | jreher | Updated box and position via API. |
28. Nov 2019 12:01:20 CET | jreher | Updated APD location via API. |
23. Aug 2019 12:01:49 CEST | jgrochowski | Updated APD batch assignment via API. |
05. Jul 2019 13:50:04 CEST | jreher | Updated APD location via API. |
03. Jan 2019 00:14:14 CET | Tobias | Corrected dark current unit. |
06. Jul 2018 22:38:43 CEST | Tobias | Imported from Hamamatsu datasheet. |