RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2904032713 - Archived data from Wed, 21. April 2021 11:01:31 CEST


This is all the information about APD 2904032713. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2904032713
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 383.3 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 109
Position in Box: 48
EP1 batch: 113
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.8798707 V     T = -25 °C: 347.3566034 V
Voltage for Gain 150: T = +20 °C: 390.7412272 V     T = -25 °C: 354.7939664 V
Voltage for Gain 200: T = +20 °C: 395.1152375 V     T = -25 °C: 358.9558202 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.623325732 V-1     T = -25 °C: 4.754819337 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.149466045 V-1     T = -25 °C: 9.609869409 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.25251355 V-1     T = -25 °C: 15.20061597 V-1
Break-through voltage: T = +20 °C: 410.6170093 V     T = -25 °C: 374.3517098 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:35:56 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:01:31 CEST jreher Updated box and position via API.
05. Feb 2021 11:02:28 CET jreher Updated box and position via API.
11. Aug 2020 18:00:22 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:11 CEST jreher Updated APD location via API.
28. Jan 2020 16:01:09 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:45 CET jreher Updated APD location via API.
28. Nov 2019 12:01:20 CET jreher Updated APD location via API.
25. Nov 2019 17:19:39 CET jreher Updated box and position via API.
23. Aug 2019 12:01:49 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:14 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:43 CEST Tobias Imported from Hamamatsu datasheet.