RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2904032703 - Archived data from Fri, 05. February 2021 11:02:27 CET


This is all the information about APD 2904032703. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2904032703
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.6 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 109
Position in Box: 39
EP1 batch: 112
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.8294924 V     T = -25 °C: 349.7684004 V
Voltage for Gain 150: T = +20 °C: 393.7437613 V     T = -25 °C: 357.2602547 V
Voltage for Gain 200: T = +20 °C: 398.1325702 V     T = -25 °C: 361.4788264 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.62086385 V-1     T = -25 °C: 4.954723838 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.16038158 V-1     T = -25 °C: 9.132626636 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.26404397 V-1     T = -25 °C: 16.22012135 V-1
Break-through voltage: T = +20 °C: 413.5440607 V     T = -25 °C: 376.9731805 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 15:57:28 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:17:19 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:27 CET jreher Updated box and position via API.
11. Aug 2020 18:00:21 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:10 CEST jreher Updated APD location via API.
28. Jan 2020 16:01:08 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:44 CET jreher Updated APD location via API.
28. Nov 2019 12:01:19 CET jreher Updated APD location via API.
25. Nov 2019 17:19:38 CET jreher Updated box and position via API.
23. Aug 2019 12:00:22 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:03 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:13 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:42 CEST Tobias Imported from Hamamatsu datasheet.