RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2904032697 - Archived data from Tue, 11. August 2020 18:00:20 CEST


This is all the information about APD 2904032697. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2904032697
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 109
Position in Box: 33
EP1 batch: 112
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.672571 V     T = -25 °C: 346.5873869 V
Voltage for Gain 150: T = +20 °C: 389.5287913 V     T = -25 °C: 354.1032997 V
Voltage for Gain 200: T = +20 °C: 393.8813047 V     T = -25 °C: 358.3573875 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.405141831 V-1     T = -25 °C: 4.706426391 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.536425891 V-1     T = -25 °C: 9.298196014 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.79638319 V-1     T = -25 °C: 14.42984816 V-1
Break-through voltage: T = +20 °C: 410.8700187 V     T = -25 °C: 373.0012576 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:26 CET jreher Updated box and position via API.
11. Aug 2020 18:00:20 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:10 CEST jreher Updated APD location via API.
28. Jan 2020 16:01:07 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:44 CET jreher Updated APD location via API.
28. Nov 2019 12:01:19 CET jreher Updated APD location via API.
25. Nov 2019 17:19:37 CET jreher Updated box and position via API.
23. Aug 2019 12:00:22 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:03 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:13 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:42 CEST Tobias Imported from Hamamatsu datasheet.