RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2903032669 - Archived data from Fri, 05. February 2021 11:02:24 CET


This is all the information about APD 2903032669. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2903032669
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.1 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 109
Position in Box: 12
EP1 batch: 111
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0876034 V     T = -25 °C: 343.8123028 V
Voltage for Gain 150: T = +20 °C: 386.905653 V     T = -25 °C: 351.1290585 V
Voltage for Gain 200: T = +20 °C: 391.2758583 V     T = -25 °C: 355.2494809 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.604551538 V-1     T = -25 °C: 5.025187713 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.049501513 V-1     T = -25 °C: 9.429020858 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.03920617 V-1     T = -25 °C: 14.91496361 V-1
Break-through voltage: T = +20 °C: 407.1116255 V     T = -25 °C: 370.7145143 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 12:53:47 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:41:48 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:02:24 CET jreher Updated box and position via API.
11. Aug 2020 18:00:15 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:08 CEST jreher Updated APD location via API.
28. Jan 2020 15:48:20 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:42 CET jreher Updated APD location via API.
28. Nov 2019 12:01:17 CET jreher Updated APD location via API.
25. Nov 2019 17:19:35 CET jreher Updated box and position via API.
23. Aug 2019 12:00:05 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:01 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:13 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:42 CEST Tobias Imported from Hamamatsu datasheet.