RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2903032664 - Archived data from Tue, 11. August 2020 18:00:14 CEST


This is all the information about APD 2903032664. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2903032664
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.1 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 109
Position in Box: 7
EP1 batch: 111
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.4569242 V     T = -25 °C: 348.729115 V
Voltage for Gain 150: T = +20 °C: 392.3027992 V     T = -25 °C: 356.1625354 V
Voltage for Gain 200: T = +20 °C: 396.6647946 V     T = -25 °C: 360.3323144 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.449724052 V-1     T = -25 °C: 4.670396875 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.82994851 V-1     T = -25 °C: 9.397997055 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.55706171 V-1     T = -25 °C: 14.88365445 V-1
Break-through voltage: T = +20 °C: 411.4302793 V     T = -25 °C: 375.2042074 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:38:12 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:18:57 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:23 CET jreher Updated box and position via API.
11. Aug 2020 18:00:14 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:07 CEST jreher Updated APD location via API.
28. Jan 2020 15:48:20 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:42 CET jreher Updated APD location via API.
28. Nov 2019 12:01:17 CET jreher Updated APD location via API.
25. Nov 2019 17:19:35 CET jreher Updated box and position via API.
23. Aug 2019 12:00:05 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:00 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:12 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:42 CEST Tobias Imported from Hamamatsu datasheet.