RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2903032641 - Archived data from Tue, 11. August 2020 18:06:20 CEST


This is all the information about APD 2903032641. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2903032641
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 108
Position in Box: 37
EP1 batch: 111
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.5873929 V     T = -25 °C: 344.1547132 V
Voltage for Gain 150: T = +20 °C: 387.4089527 V     T = -25 °C: 351.5113647 V
Voltage for Gain 200: T = +20 °C: 391.7722382 V     T = -25 °C: 355.6302629 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.45608736 V-1     T = -25 °C: 4.889743277 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.65647051 V-1     T = -25 °C: 9.108577056 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.01815414 V-1     T = -25 °C: 16.21052118 V-1
Break-through voltage: T = +20 °C: 407.8580601 V     T = -25 °C: 371.2572043 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:19 CET jreher Updated box and position via API.
11. Aug 2020 18:06:20 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:05 CEST jreher Updated APD location via API.
25. Feb 2020 17:02:05 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:40 CET jreher Updated APD location via API.
28. Nov 2019 12:01:16 CET jreher Updated APD location via API.
25. Nov 2019 17:19:33 CET jreher Updated box and position via API.
23. Aug 2019 12:00:03 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:59 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:12 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:41 CEST Tobias Imported from Hamamatsu datasheet.