RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2903032628 - Archived data from Fri, 05. February 2021 11:02:18 CET


This is all the information about APD 2903032628. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2903032628
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.4 V
Dark current: 8.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 108
Position in Box: 28
EP1 batch: 110
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.1516189 V     T = -25 °C: 346.7616267 V
Voltage for Gain 150: T = +20 °C: 389.9884894 V     T = -25 °C: 354.1315346 V
Voltage for Gain 200: T = +20 °C: 394.3586082 V     T = -25 °C: 358.2717558 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.582018628 V-1     T = -25 °C: 5.038888576 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.017442962 V-1     T = -25 °C: 9.383919266 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.00556804 V-1     T = -25 °C: 14.85883105 V-1
Break-through voltage: T = +20 °C: 409.69066 V     T = -25 °C: 373.3809739 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:24:19 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:14:54 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:02:18 CET jreher Updated box and position via API.
11. Aug 2020 18:06:14 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:04 CEST jreher Updated APD location via API.
25. Feb 2020 17:02:05 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:39 CET jreher Updated APD location via API.
28. Nov 2019 12:01:15 CET jreher Updated APD location via API.
25. Nov 2019 17:19:32 CET jreher Updated box and position via API.
23. Aug 2019 11:59:46 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:58 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:11 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:41 CEST Tobias Imported from Hamamatsu datasheet.