RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2902032578 - Archived data from Tue, 11. August 2020 18:06:03 CEST


This is all the information about APD 2902032578. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2902032578
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.4 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 108
Position in Box: 3
EP1 batch: 110
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.3096112 V     T = -25 °C: 354.5496201 V
Voltage for Gain 150: T = +20 °C: 398.1984162 V     T = -25 °C: 362.1358557 V
Voltage for Gain 200: T = +20 °C: 402.5732158 V     T = -25 °C: 366.5819769 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.464407485 V-1     T = -25 °C: 6.142375427 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.758699062 V-1     T = -25 °C: 7.118023723 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.36399443 V-1     T = -25 °C: 15.21523514 V-1
Break-through voltage: T = +20 °C: 417.1697953 V     T = -25 °C: 380.6496614 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:02:15 CET jreher Updated box and position via API.
11. Aug 2020 18:06:03 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:02 CEST jreher Updated APD location via API.
25. Feb 2020 16:59:13 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:38 CET jreher Updated APD location via API.
28. Nov 2019 12:01:13 CET jreher Updated APD location via API.
25. Nov 2019 17:19:30 CET jreher Updated box and position via API.
23. Aug 2019 11:59:44 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:11 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:40 CEST Tobias Imported from Hamamatsu datasheet.