RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2808031410 - Archived data from Thu, 03. January 2019 00:14:11 CET


This is all the information about APD 2808031410. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2808031410
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 173
Position in Box: 49
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:31:04 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:05:30 CET jreher Updated box and position via API.
11. Aug 2020 18:01:05 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:49 CEST jreher Updated APD location via API.
28. Jan 2020 16:22:50 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:13 CET jreher Updated APD location via API.
27. Nov 2019 19:52:17 CET jreher Updated APD location via API.
25. Nov 2019 17:21:29 CET jreher Updated box and position via API.
17. Sep 2019 12:06:15 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:54:03 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:11 CET Tobias Corrected dark current unit.
05. Jul 2018 14:27:56 CEST Tobias Imported from Hamamatsu datasheet.