RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2808031391 - Archived data from Fri, 05. February 2021 11:05:29 CET


This is all the information about APD 2808031391. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2808031391
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.5 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 173
Position in Box: 39
EP1 batch: 150
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.5840127 V     T = -25 °C: 346.8605163 V
Voltage for Gain 150: T = +20 °C: 390.378555 V     T = -25 °C: 354.1887005 V
Voltage for Gain 200: T = +20 °C: 394.7114399 V     T = -25 °C: 358.2993022 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.461615842 V-1     T = -25 °C: 5.03990088 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.757278324 V-1     T = -25 °C: 9.441272464 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.36445465 V-1     T = -25 °C: 14.97778419 V-1
Break-through voltage: T = +20 °C: 409.9494999 V     T = -25 °C: 373.4722241 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:31:03 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:05:29 CET jreher Updated box and position via API.
11. Aug 2020 18:01:03 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:48 CEST jreher Updated APD location via API.
28. Jan 2020 16:22:49 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:12 CET jreher Updated APD location via API.
27. Nov 2019 19:52:17 CET jreher Updated APD location via API.
25. Nov 2019 17:21:28 CET jreher Updated box and position via API.
17. Sep 2019 12:04:32 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:54:02 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:10 CET Tobias Corrected dark current unit.
05. Jul 2018 14:27:55 CEST Tobias Imported from Hamamatsu datasheet.