RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2902032572 - Archived data from Fri, 05. July 2019 13:49:56 CEST


This is all the information about APD 2902032572. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2902032572
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 98
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.3 V
Dark current: 12.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 102
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 12:53:13 CET oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:56 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:33 CET jreher Updated box and position via API.
11. Aug 2020 18:05:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:39 CEST jreher Updated APD location via API.
20. Feb 2020 15:16:06 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:18 CET jreher Updated APD location via API.
28. Nov 2019 12:01:13 CET jreher Updated APD location via API.
25. Nov 2019 17:19:05 CET jreher Updated box and position via API.
20. Aug 2019 12:47:59 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:10 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:39 CEST Tobias Imported from Hamamatsu datasheet.