RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2902032571 - Archived data from Wed, 28. April 2021 13:28:53 CEST


This is all the information about APD 2902032571. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2902032571
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 102
Position in Box: 46
EP1 batch: 100
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.3103326 V     T = -25 °C: 345.2592064 V
Voltage for Gain 150: T = +20 °C: 388.2130454 V     T = -25 °C: 352.6250182 V
Voltage for Gain 200: T = +20 °C: 392.6128633 V     T = -25 °C: 356.7550003 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.503951243 V-1     T = -25 °C: 4.862587508 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.550082012 V-1     T = -25 °C: 10.04318543 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.93190114 V-1     T = -25 °C: 15.58878209 V-1
Break-through voltage: T = +20 °C: 408.3660166 V     T = -25 °C: 372.1018465 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:14:10 CEST oafedulidis Assigned to capsule by script
28. Apr 2021 13:28:53 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:33 CET jreher Updated box and position via API.
11. Aug 2020 18:05:49 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:39 CEST jreher Updated APD location via API.
20. Feb 2020 15:16:06 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:18 CET jreher Updated APD location via API.
28. Nov 2019 12:01:13 CET jreher Updated APD location via API.
25. Nov 2019 17:19:05 CET jreher Updated box and position via API.
20. Aug 2019 12:47:58 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:10 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:38 CEST Tobias Imported from Hamamatsu datasheet.