RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2902032550 - Archived data from Mon, 03. May 2021 15:19:24 CEST


This is all the information about APD 2902032550. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2902032550
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 102
Position in Box: 26
EP1 batch: 100
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.3287818 V     T = -25 °C: 346.9754 V
Voltage for Gain 150: T = +20 °C: 390.1927354 V     T = -25 °C: 354.3915067 V
Voltage for Gain 200: T = +20 °C: 394.5680171 V     T = -25 °C: 358.546102 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.47595385 V-1     T = -25 °C: 4.881182661 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.79712799 V-1     T = -25 °C: 9.049259942 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.31718249 V-1     T = -25 °C: 16.14416554 V-1
Break-through voltage: T = +20 °C: 409.7132853 V     T = -25 °C: 373.3995291 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:25:03 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:19:24 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:30 CET jreher Updated box and position via API.
11. Aug 2020 18:05:45 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:37 CEST jreher Updated APD location via API.
20. Feb 2020 15:12:45 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:16 CET jreher Updated APD location via API.
28. Nov 2019 12:01:11 CET jreher Updated APD location via API.
25. Nov 2019 17:19:03 CET jreher Updated box and position via API.
20. Aug 2019 12:47:57 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:09 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:38 CEST Tobias Imported from Hamamatsu datasheet.