RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2902032546 - Archived data from Tue, 16. February 2021 12:26:09 CET


This is all the information about APD 2902032546. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2902032546
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.6 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 102
Position in Box: 22
EP1 batch: 99
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.7417905 V     T = -25 °C: 347.450485 V
Voltage for Gain 150: T = +20 °C: 390.6548872 V     T = -25 °C: 354.8839987 V
Voltage for Gain 200: T = +20 °C: 395.0546348 V     T = -25 °C: 359.0586627 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.659826029 V-1     T = -25 °C: 4.688932992 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.195257361 V-1     T = -25 °C: 9.492748132 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.27962954 V-1     T = -25 °C: 14.98253175 V-1
Break-through voltage: T = +20 °C: 410.729294 V     T = -25 °C: 374.4352894 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:04:42 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:09 CET jreher Updated box and position via API.
05. Feb 2021 11:01:30 CET jreher Updated box and position via API.
11. Aug 2020 18:05:44 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:36 CEST jreher Updated APD location via API.
20. Feb 2020 15:12:44 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:16 CET jreher Updated APD location via API.
28. Nov 2019 12:01:10 CET jreher Updated APD location via API.
25. Nov 2019 17:19:03 CET jreher Updated box and position via API.
20. Aug 2019 12:47:31 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:09 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:38 CEST Tobias Imported from Hamamatsu datasheet.