RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2902032536 - Archived data from Fri, 05. February 2021 11:01:29 CET


This is all the information about APD 2902032536. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2902032536
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.3 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 102
Position in Box: 13
EP1 batch: 99
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.7627752 V     T = -25 °C: 342.9947207 V
Voltage for Gain 150: T = +20 °C: 385.5893743 V     T = -25 °C: 350.2771165 V
Voltage for Gain 200: T = +20 °C: 389.9475678 V     T = -25 °C: 354.3661909 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.407318583 V-1     T = -25 °C: 5.038847458 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.571389448 V-1     T = -25 °C: 9.461276348 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.91779855 V-1     T = -25 °C: 15.02516149 V-1
Break-through voltage: T = +20 °C: 405.8338669 V     T = -25 °C: 369.5727015 V
   
Notes:


Version history

Time Author Change comment
16. May 2022 13:33:12 CEST oafedulidis Updated box and position via API.
28. Apr 2021 13:29:35 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:29 CET jreher Updated box and position via API.
11. Aug 2020 18:05:43 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:35 CEST jreher Updated APD location via API.
20. Feb 2020 15:12:44 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:15 CET jreher Updated APD location via API.
28. Nov 2019 12:01:10 CET jreher Updated APD location via API.
25. Nov 2019 17:19:02 CET jreher Updated box and position via API.
20. Aug 2019 12:47:31 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:53 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:09 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:37 CEST Tobias Imported from Hamamatsu datasheet.