RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032508 - Archived data from Wed, 16. June 2021 16:02:38 CEST


This is all the information about APD 2901032508. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032508
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 102
Position in Box: 7
EP1 batch: 99
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.811662 V     T = -25 °C: 344.4843681 V
Voltage for Gain 150: T = +20 °C: 387.5947895 V     T = -25 °C: 351.8217348 V
Voltage for Gain 200: T = +20 °C: 391.9069307 V     T = -25 °C: 355.9249575 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.709971542 V-1     T = -25 °C: 4.770666184 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.395055291 V-1     T = -25 °C: 9.729312262 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.77645675 V-1     T = -25 °C: 15.52537506 V-1
Break-through voltage: T = +20 °C: 407.5197221 V     T = -25 °C: 371.1514692 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:41:51 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:02:38 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:58:55 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:51:45 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:28 CET jreher Updated box and position via API.
11. Aug 2020 18:05:42 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:35 CEST jreher Updated APD location via API.
20. Feb 2020 15:12:43 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:15 CET jreher Updated APD location via API.
28. Nov 2019 12:01:09 CET jreher Updated APD location via API.
25. Nov 2019 17:19:02 CET jreher Updated box and position via API.
20. Aug 2019 12:47:30 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:52 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:09 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:37 CEST Tobias Imported from Hamamatsu datasheet.