RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032505 - Archived data from Tue, 11. August 2020 18:05:41 CEST


This is all the information about APD 2901032505. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032505
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 102
Position in Box: 4
EP1 batch: 99
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.553925 V     T = -25 °C: 344.9665915 V
Voltage for Gain 150: T = +20 °C: 388.3557939 V     T = -25 °C: 352.3300616 V
Voltage for Gain 200: T = +20 °C: 392.6937883 V     T = -25 °C: 356.4583741 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.477168685 V-1     T = -25 °C: 4.939648424 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.737889627 V-1     T = -25 °C: 9.178981549 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.19530042 V-1     T = -25 °C: 16.51614851 V-1
Break-through voltage: T = +20 °C: 407.7864262 V     T = -25 °C: 371.3275586 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 15:06:19 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:20:41 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:28 CET jreher Updated box and position via API.
11. Aug 2020 18:05:41 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:35 CEST jreher Updated APD location via API.
20. Feb 2020 15:12:43 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:15 CET jreher Updated APD location via API.
28. Nov 2019 12:01:09 CET jreher Updated APD location via API.
25. Nov 2019 17:19:02 CET jreher Updated box and position via API.
20. Aug 2019 12:47:30 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:52 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:09 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:37 CEST Tobias Imported from Hamamatsu datasheet.