RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032504 - Archived data from Tue, 11. August 2020 18:05:41 CEST


This is all the information about APD 2901032504. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032504
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 102
Position in Box: 3
EP1 batch: 99
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.9074782 V     T = -25 °C: 343.684811 V
Voltage for Gain 150: T = +20 °C: 386.7348934 V     T = -25 °C: 351.0084107 V
Voltage for Gain 200: T = +20 °C: 391.0928626 V     T = -25 °C: 355.1215875 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.656721477 V-1     T = -25 °C: 5.064779553 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.210461693 V-1     T = -25 °C: 9.512800159 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.30357166 V-1     T = -25 °C: 15.05911102 V-1
Break-through voltage: T = +20 °C: 407.1212944 V     T = -25 °C: 370.5595141 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:32:24 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:51 CEST jreher Updated box and position via API.
05. Feb 2021 11:01:28 CET jreher Updated box and position via API.
11. Aug 2020 18:05:41 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:35 CEST jreher Updated APD location via API.
20. Feb 2020 15:12:43 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:15 CET jreher Updated APD location via API.
28. Nov 2019 12:01:09 CET jreher Updated APD location via API.
25. Nov 2019 17:19:02 CET jreher Updated box and position via API.
20. Aug 2019 12:47:30 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:52 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:09 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:37 CEST Tobias Imported from Hamamatsu datasheet.