RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032500 - Archived data from Tue, 11. August 2020 18:05:40 CEST


This is all the information about APD 2901032500. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032500
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 101
Position in Box: 49
EP1 batch: 99
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.5027808 V     T = -25 °C: 347.9134541 V
Voltage for Gain 150: T = +20 °C: 391.3642639 V     T = -25 °C: 355.3239526 V
Voltage for Gain 200: T = +20 °C: 395.7323587 V     T = -25 °C: 359.4850047 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.480654637 V-1     T = -25 °C: 4.966476303 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.770757671 V-1     T = -25 °C: 9.272681727 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.3859597 V-1     T = -25 °C: 14.64494414 V-1
Break-through voltage: T = +20 °C: 411.6976747 V     T = -25 °C: 375.1759263 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:03:55 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:46 CET jreher Updated box and position via API.
05. Feb 2021 11:01:26 CET jreher Updated box and position via API.
11. Aug 2020 18:05:40 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:34 CEST jreher Updated APD location via API.
20. Feb 2020 15:12:43 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:14 CET jreher Updated APD location via API.
28. Nov 2019 12:01:09 CET jreher Updated APD location via API.
25. Nov 2019 17:19:01 CET jreher Updated box and position via API.
20. Aug 2019 12:47:30 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:52 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:08 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:37 CEST Tobias Imported from Hamamatsu datasheet.