RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032491 - Archived data from Tue, 11. August 2020 18:05:39 CEST


This is all the information about APD 2901032491. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032491
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.2 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 101
Position in Box: 40
EP1 batch: 98
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.1583713 V     T = -25 °C: 348.2472659 V
Voltage for Gain 150: T = +20 °C: 391.9925227 V     T = -25 °C: 355.7803099 V
Voltage for Gain 200: T = +20 °C: 396.3593132 V     T = -25 °C: 359.9862671 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.562743485 V-1     T = -25 °C: 4.102876014 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.018499145 V-1     T = -25 °C: 9.601458856 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.01581472 V-1     T = -25 °C: 14.68927487 V-1
Break-through voltage: T = +20 °C: 412.3030012 V     T = -25 °C: 375.8859094 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:01:25 CET jreher Updated box and position via API.
11. Aug 2020 18:05:39 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:33 CEST jreher Updated APD location via API.
20. Feb 2020 15:00:05 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:14 CET jreher Updated APD location via API.
28. Nov 2019 12:01:08 CET jreher Updated APD location via API.
25. Nov 2019 17:19:00 CET jreher Updated box and position via API.
20. Aug 2019 12:47:06 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:08 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:36 CEST Tobias Imported from Hamamatsu datasheet.