RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032489 - Archived data from Fri, 05. February 2021 11:01:24 CET


This is all the information about APD 2901032489. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032489
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 10 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 101
Position in Box: 38
EP1 batch: 98
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.2594232 V     T = -25 °C: 344.8046289 V
Voltage for Gain 150: T = +20 °C: 388.0753452 V     T = -25 °C: 352.1779023 V
Voltage for Gain 200: T = +20 °C: 392.4329195 V     T = -25 °C: 356.3595796 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.502543141 V-1     T = -25 °C: 4.832048702 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.90632891 V-1     T = -25 °C: 9.384957604 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.51039844 V-1     T = -25 °C: 14.53562941 V-1
Break-through voltage: T = +20 °C: 408.3246769 V     T = -25 °C: 371.9879847 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:21:00 CET jreher Assigned to capsule by script
05. Feb 2021 11:01:24 CET jreher Updated box and position via API.
18. Dec 2020 13:59:25 CET jreher Updated box and position via API.
11. Aug 2020 18:05:38 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:33 CEST jreher Updated APD location via API.
20. Feb 2020 15:00:05 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:14 CET jreher Updated APD location via API.
28. Nov 2019 12:01:08 CET jreher Updated APD location via API.
25. Nov 2019 17:19:00 CET jreher Updated box and position via API.
20. Aug 2019 12:47:06 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:08 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:36 CEST Tobias Imported from Hamamatsu datasheet.