RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032482 - Archived data from Fri, 05. February 2021 11:01:24 CET


This is all the information about APD 2901032482. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032482
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 101
Position in Box: 32
EP1 batch: 98
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.3600805 V     T = -25 °C: 348.5560351 V
Voltage for Gain 150: T = +20 °C: 392.2006338 V     T = -25 °C: 356.029482 V
Voltage for Gain 200: T = +20 °C: 396.5629413 V     T = -25 °C: 360.2568915 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.47817582 V-1     T = -25 °C: 4.031100896 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.797703203 V-1     T = -25 °C: 9.298915678 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.40822109 V-1     T = -25 °C: 14.15158499 V-1
Break-through voltage: T = +20 °C: 411.792491 V     T = -25 °C: 375.5927772 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:38:09 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:18:55 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:01:24 CET jreher Updated box and position via API.
11. Aug 2020 18:05:36 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:33 CEST jreher Updated APD location via API.
20. Feb 2020 15:00:04 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:13 CET jreher Updated APD location via API.
28. Nov 2019 12:01:08 CET jreher Updated APD location via API.
25. Nov 2019 17:18:59 CET jreher Updated box and position via API.
20. Aug 2019 12:47:06 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:50 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:08 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:36 CEST Tobias Imported from Hamamatsu datasheet.