RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032466 - Archived data from Tue, 11. August 2020 18:05:33 CEST


This is all the information about APD 2901032466. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032466
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 101
Position in Box: 17
EP1 batch: 98
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.3223892 V     T = -25 °C: 345.2801643 V
Voltage for Gain 150: T = +20 °C: 388.1470593 V     T = -25 °C: 352.6616765 V
Voltage for Gain 200: T = +20 °C: 392.5098848 V     T = -25 °C: 356.7911696 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.507128036 V-1     T = -25 °C: 4.802183532 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.869222907 V-1     T = -25 °C: 9.811641319 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.44102999 V-1     T = -25 °C: 15.65114672 V-1
Break-through voltage: T = +20 °C: 408.2355462 V     T = -25 °C: 372.3908217 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:01:22 CET jreher Updated box and position via API.
11. Aug 2020 18:05:33 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:31 CEST jreher Updated APD location via API.
20. Feb 2020 14:54:09 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:12 CET jreher Updated APD location via API.
28. Nov 2019 12:01:06 CET jreher Updated APD location via API.
25. Nov 2019 17:18:58 CET jreher Updated box and position via API.
20. Aug 2019 12:47:05 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:49 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:07 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:35 CEST Tobias Imported from Hamamatsu datasheet.