RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032464 - Archived data from Tue, 06. October 2020 18:40:28 CEST


This is all the information about APD 2901032464. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032464
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 7.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 44
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.9787065 V     T = -25 °C: 346.7658077 V
Voltage for Gain 150: T = +20 °C: 389.8478559 V     T = -25 °C: 354.0781163 V
Voltage for Gain 200: T = +20 °C: 394.1960753 V     T = -25 °C: 358.2493572 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.229915796 V-1     T = -25 °C: 4.982284681 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.35967953 V-1     T = -25 °C: 9.743448755 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.18761494 V-1     T = -25 °C: 15.97737407 V-1
Break-through voltage: T = +20 °C: 408.1185374 V     T = -25 °C: 373.6674306 V
   
Notes: foam


Version history

Time Author Change comment
22. Feb 2021 11:10:47 CET jreher Updated box and position via API.
05. Feb 2021 11:01:21 CET jreher Updated box and position via API.
05. Feb 2021 10:53:50 CET jreher Updated box and position via API.
03. Feb 2021 18:19:37 CET jreher Updated box and position via API.
06. Oct 2020 18:40:28 CEST jreher
11. Aug 2020 17:26:49 CEST jreher Updated APD characteristics via API.
04. Aug 2020 15:48:17 CEST jreher Updated box and position via API.
29. Nov 2019 10:57:24 CET jreher Updated APD location via API.
27. Nov 2019 19:36:48 CET jreher Updated APD location via API.
25. Nov 2019 17:18:58 CET jreher Updated box and position via API.
25. Nov 2019 17:14:24 CET jreher Updated box and position via API.
04. Jul 2019 11:11:34 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:40 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:37 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:14:07 CET Tobias Corrected dark current unit.
21. Aug 2018 12:01:28 CEST markus.moritz
20. Jun 2018 13:36:35 CEST Tobias Imported from Hamamatsu datasheet.