RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032462 - Archived data from Tue, 06. October 2020 18:40:08 CEST


This is all the information about APD 2901032462. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032462
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 44
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1710848 V     T = -25 °C: 345.873938 V
Voltage for Gain 150: T = +20 °C: 388.9734784 V     T = -25 °C: 353.2774466 V
Voltage for Gain 200: T = +20 °C: 393.3837806 V     T = -25 °C: 357.4502393 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.658043187 V-1     T = -25 °C: 4.303843842 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.875517668 V-1     T = -25 °C: 9.199714709 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 16.75916121 V-1     T = -25 °C: 17.85168405 V-1
Break-through voltage: T = +20 °C: 408.2838903 V     T = -25 °C: 372.3613669 V
   
Notes: foam


Version history

Time Author Change comment
15. Nov 2022 13:36:57 CET oafedulidis Assigned to capsule by script
22. Feb 2021 11:10:47 CET jreher Updated box and position via API.
05. Feb 2021 11:01:21 CET jreher Updated box and position via API.
05. Feb 2021 10:53:49 CET jreher Updated box and position via API.
03. Feb 2021 18:19:37 CET jreher Updated box and position via API.
06. Oct 2020 18:40:08 CEST jreher
11. Aug 2020 17:26:48 CEST jreher Updated APD characteristics via API.
04. Aug 2020 15:48:17 CEST jreher Updated box and position via API.
29. Nov 2019 10:57:24 CET jreher Updated APD location via API.
27. Nov 2019 19:36:48 CET jreher Updated APD location via API.
25. Nov 2019 17:18:57 CET jreher Updated box and position via API.
25. Nov 2019 17:14:24 CET jreher Updated box and position via API.
04. Jul 2019 11:11:34 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:40 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:37 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:14:07 CET Tobias Corrected dark current unit.
21. Aug 2018 12:07:33 CEST markus.moritz
20. Jun 2018 13:36:35 CEST Tobias Imported from Hamamatsu datasheet.