RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032462


This is all the information about APD 2901032462. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032462
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2412026839/2901032462
Unit: #3818 (barcode 1309040230)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 7.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 44
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: 10071
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1710848 V     T = -25 °C: 345.873938 V
Voltage for Gain 150: T = +20 °C: 388.9734784 V     T = -25 °C: 353.2774466 V
Voltage for Gain 200: T = +20 °C: 393.3837806 V     T = -25 °C: 357.4502393 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.658043187 V-1     T = -25 °C: 4.303843842 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.875517668 V-1     T = -25 °C: 9.199714709 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 16.75916121 V-1     T = -25 °C: 17.85168405 V-1
Break-through voltage: T = +20 °C: 408.2838903 V     T = -25 °C: 372.3613669 V
   
Notes: foam


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
15. Nov 2022 13:36:57 CET oafedulidis Assigned to capsule by script
22. Feb 2021 11:10:47 CET jreher Updated box and position via API.
05. Feb 2021 11:01:21 CET jreher Updated box and position via API.
05. Feb 2021 10:53:49 CET jreher Updated box and position via API.
03. Feb 2021 18:19:37 CET jreher Updated box and position via API.
06. Oct 2020 18:40:08 CEST jreher
11. Aug 2020 17:26:48 CEST jreher Updated APD characteristics via API.
04. Aug 2020 15:48:17 CEST jreher Updated box and position via API.
29. Nov 2019 10:57:24 CET jreher Updated APD location via API.
27. Nov 2019 19:36:48 CET jreher Updated APD location via API.
25. Nov 2019 17:18:57 CET jreher Updated box and position via API.
25. Nov 2019 17:14:24 CET jreher Updated box and position via API.
04. Jul 2019 11:11:34 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:40 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:37 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:14:07 CET Tobias Corrected dark current unit.
21. Aug 2018 12:07:33 CEST markus.moritz
20. Jun 2018 13:36:35 CEST Tobias Imported from Hamamatsu datasheet.