RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2901032454 - Archived data from Fri, 05. February 2021 10:53:49 CET


This is all the information about APD 2901032454. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2901032454
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 384 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 44
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.7096988 V     T = -25 °C: 348.0584222 V
Voltage for Gain 150: T = +20 °C: 391.5687895 V     T = -25 °C: 355.5132691 V
Voltage for Gain 200: T = +20 °C: 395.8888746 V     T = -25 °C: 359.6256012 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.532625592 V-1     T = -25 °C: 4.895313048 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.546822936 V-1     T = -25 °C: 10.22509631 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.41753243 V-1     T = -25 °C: 15.41003246 V-1
Break-through voltage: T = +20 °C: 410.2776679 V     T = -25 °C: 374.4065876 V
   
Notes: foam


Version history

Time Author Change comment
27. Jun 2022 12:43:19 CEST oafedulidis Assigned to capsule by script
30. Aug 2021 14:08:38 CEST oafedulidis Updated box and position via API.
22. Feb 2021 11:10:46 CET jreher Updated box and position via API.
05. Feb 2021 11:01:20 CET jreher Updated box and position via API.
05. Feb 2021 10:53:49 CET jreher Updated box and position via API.
03. Feb 2021 18:19:36 CET jreher Updated box and position via API.
06. Oct 2020 18:38:29 CEST jreher
11. Aug 2020 17:26:47 CEST jreher Updated APD characteristics via API.
04. Aug 2020 15:48:16 CEST jreher Updated box and position via API.
29. Nov 2019 10:57:24 CET jreher Updated APD location via API.
27. Nov 2019 19:36:47 CET jreher Updated APD location via API.
25. Nov 2019 17:18:57 CET jreher Updated box and position via API.
25. Nov 2019 17:14:23 CET jreher Updated box and position via API.
04. Jul 2019 11:11:34 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:40 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:36 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:14:07 CET Tobias Corrected dark current unit.
21. Aug 2018 12:04:21 CEST markus.moritz
20. Jun 2018 13:36:35 CEST Tobias Imported from Hamamatsu datasheet.